티스토리 뷰

Topic - Time

delphi technique - experts involved. e.g. hire multiple expert and get different opinion and sum up.

agile method is more short time framded compared to traditional way.

Try to every method available.

PERT estimation is sum up  6 opinion and get result from it.

A task which isn't on critical path is called slack.

 

Week 4 Wed Workshop

 

Estimate each time of the tasks

1.            Go to an ECU coffeeshop and buy a large sized Soy-Flat white coffee - 15 Minutes

2.            Go to level 3 of the ECU library and find a book on fenacling - 20 Minutes

3.            Go to Building 1 at ECU and pay a $100 Parking fine

4.            Study and revice the week 4 CSG2344 lecture slides

5.            Eat lunch outside sitting on a bench

6.            Go to Building 21 and purchase a can of Redbull from a vending machine on level 3

 

Order

Go to Building 21 and get a can of Redbull (Task 6, 15 minutes). With a can of Redbull, go to library and have a lunch at nearby bench (Task 5, 30 minutes). After that, go to level 3 of the ECU library and find a book on Fenacling and revise week 4 CSG2344 (Task 2 and 4, 10 minutes and 20 minutes). Go to Building 1 cafe and order a large sized Soy-Flat white coffee. While the coffee is made, go to payment departure and pay $100 fine (Task 1 and Task 3, 20 minutes and 10 minutes).


'AU Study > CSG2344 Project Methods and Professional' 카테고리의 다른 글

W6 Wed 05092018  (0) 2018.09.06
W5 Wed 29082018  (0) 2018.08.29
W3 Wed 15082018  (0) 2018.08.15
W2 Wed 08082018  (0) 2018.08.08
W1 Wed 01022018  (0) 2018.08.04
댓글
Announcement
Recent Posts
Recent Comments
Total
Today
Yesterday
Link
TAG
more
«   2024/05   »
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Search by month